Choose a Padbol court manufacturer by checking who signs the order, which model and documents it covers, who handles delivery and site work, and what support remains after handover. Ask each supplier to answer the same written request so you can compare the offers on equal terms.
Two proposals can name the same sport and leave your team with different jobs. One may include a drawing review while another leaves that work with your contractor. Use the questions and tables below to turn those differences into a decision you can explain to the people paying for, installing, and running the court.
Key takeaways
- Record the seller, producer, installer, and service contact.
- Match the quoted court to its configuration and drawing revision.
- Compare the work each party takes on at delivery and on site.
- Resolve gaps in references, warranty, and parts support before accepting an offer.
How to choose a Padbol court manufacturer

Find out who signs the order
Start with the legal name on the quotation. Ask who will sign the order, issue the invoice, and respond if the equipment differs from what was agreed. Keep those answers beside the brand and model so your finance and project teams can refer to the same record.
A Padbol court manufacturer may appear in an offer alongside a dealer or a local installer. Ask each company to explain its part. A distributor can be the seller if that is the arrangement the parties agree to, and the order should make clear who will respond to questions about the product.
Map the roles before comparing companies
| Role | Question to ask |
|---|---|
| Seller | Which entity accepts the order and handles changes? |
| Producer | Who makes the quoted system and confirms the model documents? |
| Installer | Who performs the site work and records the agreed checks? |
| Service contact | Who handles missing items, warranty requests, and parts enquiries? |
A Padbol court manufacturer can explain which tasks it handles directly and which it assigns to others. Ask for contact details and confirm when each party becomes involved. If a task appears in several proposals, identify the person who will own it for your order.
Illustrative scenario. A buyer sees a brand on the drawings and a different company on the quote. The buyer asks both parties to confirm who will supply revised drawings and who will handle a parts request. The resulting answers go into the order review.
For a PEDI model enquiry, share your planned use, site location, and requested supply scope. Send your project details to PEDI.
Verify the court model and its documents
Match the quotation to a drawing revision
Ask the Padbol court manufacturer for a written configuration that identifies the quoted model, supplied components, and options. Keep it with the layout and the quotation. Each document should have a reference your team can use when asking for a change or checking the delivery.
PEDI’s PC099 page lists a nominal 10 × 6 m court and gives a PP interlocking floor entry with 250 × 250 × 13 mm modules. Use the listing to identify the model and ask for written confirmation of the offered surface, especially if other descriptions mention turf. Request the layout for the actual order before using a catalogue figure to estimate the full site area or material quantity.
| Document | What to match |
|---|---|
| Quotation | Seller, model, quantity, and scope |
| Configuration schedule | Included items and chosen options |
| Layout | Drawing reference, revision, and dimension labels |
| Installation information | System identity and inputs needed by the site team |
| Care information | Installed components and instructions for the operator |
Check what each document covers
When a Padbol court manufacturer provides a report or certificate, read the issuing body, named product, and stated scope. Ask the supplier to point out the part that applies to the proposed system. If a report concerns one component, keep that component label beside the claim when you enter it in your comparison.
The official rules describe the sport, including the playing area and court features. Use the rulebook when checking a sporting requirement and the model documents when discussing the supplied system. Have the responsible project reviewers identify the records they need for their part of the work. FIPA official game rules.
Illustrative scenario. A report names a component different from the one on a buyer’s quote. The buyer records the mismatch and asks for the document tied to the offered component. That question stays open until the supplier provides a clear answer.
A Padbol court manufacturer should be able to say which documents are ready to share and which depend on confirmed inputs. Record the expected issue stage for each item. If your contractor needs an interface drawing before work starts, make that dependency clear in the review.
Compare the scope offered by each Padbol court manufacturer

Give suppliers the same request
Use one request for quotation, or RFQ, for each Padbol court manufacturer. Include the intended use, proposed setting, site location, quantity, model preferences, and requested services. Mark information that is still provisional so the supplier can explain how it affects the offer.
Ask each Padbol court manufacturer to list the equipment and documents included in its price. Put optional items on separate lines and ask for any exclusions. When an alternative is offered, ask which parts of the request it changes and what other work may need review.
| Comparison field | What to capture for each offer |
|---|---|
| Equipment | Exact model, options, and quantity |
| Documents | Drawings and instructions supplied at each stage |
| Transport | Named place, terms, and the agreed endpoint |
| Receiving | Handling, unloading, and reporting responsibilities |
| Site support | Written scope for guidance or attendance |
| Exclusions | Tasks the buyer must arrange separately |
Record where delivery ends
If the quotation uses Incoterms, record the chosen rule, version, and named place. These terms describe certain delivery obligations, costs, and risks between buyer and seller. Check the sales agreement separately for equipment specifications, payment, installation, and warranty.
Ask the Padbol court manufacturer and the receiving team to agree who handles the equipment at the delivery point. A shared destination name can still leave questions about unloading or work beyond that point. Record the exact place, the tasks priced, and the contact who will handle changes.
Keep guidance and site work distinct
Ask whether the offer includes written instructions, remote guidance, site attendance, or an agreed installation service. Describe what you need and ask for each item to appear in the written scope. Your project coordinator can then check whether any tasks remain unassigned.
When a Padbol court manufacturer describes an offer as a package, check what the term covers in that document. A facilities team may still need separate local proposals. Keep those proposals linked to the supplier’s current configuration and avoid counting a task twice.
Review references, service and replacement parts
Ask for a reference that matches your project
Ask the Padbol court manufacturer for an example with a comparable setting and supply scope. Find out which model was supplied and which work the seller actually handled. If a reference contact is available, ask the supplier to arrange an introduction with the contact’s consent.
Give a reference a clear purpose. Ask how the buyer received the documents, whom they contacted about open items, and which services were included in that order. Keep the answers tied to that project. A photograph can illustrate a completed venue, while the project parties can explain what was supplied and how the handover was handled.
Read the service and parts terms
Request the warranty terms for your order. Ask which items it covers, when it starts, how to report a concern, and which work or transport the terms assign to each party. Keep the applicable version with the model and order references.
Ask the Padbol court manufacturer how the operator should identify a replacement item. Request the component reference and the information needed to check compatibility. A useful enquiry can then name the installed model, the part, and the document revision instead of relying on an image of a similar piece.
Use the Padbol court buying guide for the wider project sequence. For supplier selection, capture only the evidence that affects the choice and the work your team needs to arrange.
Build a decision record before placing the order

Use an evidence matrix
Write one line for each decision the purchase depends on. For every Padbol court manufacturer under review, record the source, the document revision, any gap, and the person who can answer it. Show whether an item is confirmed or still open.
| Decision | Evidence to retain | Who should review it |
|---|---|---|
| Accept the proposed seller | Written seller and order details | Buyer |
| Confirm the model | Configuration and current drawing | Supplier and project team |
| Confirm the delivery boundary | Written term, named place, and tasks | Buyer and logistics contacts |
| Confirm site support | Services, exclusions, and named providers | Project coordinator |
| Plan service after opening | Warranty terms, part references, and contacts | Operator |
Illustrative scenario. Two offers name the same destination. One lists unloading and the other leaves it unclear. The buyer asks each Padbol court manufacturer to confirm the exact tasks and updates the comparison before approving either offer.
Track changes to the offer
Give each offer a revision date and save the earlier version with the decision record. When a Padbol court manufacturer changes a surface, component, or delivery task, ask for a short list of the changes. Check whether anyone who reviewed the earlier offer needs to review it again.
Use these questions before you circulate an updated comparison:
- Has the equipment list changed?
- Does the current drawing match the revised offer?
- Has any task moved from the seller to the buyer?
- Does the receiving team have the right contact?
- Which open questions could still affect acceptance?
Keep the answers with the current quotation. If you’re waiting for a response, give the item an owner and a date for the next check. This helps the buyer and operator see which terms they can rely on. It also gives the receiving team a record to consult if the paperwork describes different items.
Close the questions that affect acceptance
Review the matrix with your own team and ask which gaps could change the choice. Assign an owner and a next action. Where a drawing, report, or service term is still pending, keep the decision linked to that missing record.
Before you accept an offer from a Padbol court manufacturer, check that the final quotation and the latest documents describe the same purchase. If a change has been agreed, ask for the revised version and make it easy for the receiving team to find. Store the service contact and parts information where the operator can use them after handover.
Frequently asked questions
Can a distributor be the contracting party?
Yes, if that is the agreed arrangement. Confirm its legal identity and responsibilities, then identify who provides the model documents and support. Use the written proposal to see whom to contact for each task.
Which drawings should I request?
Ask the Padbol court manufacturer for the current layout, the dimensions and access points it shows, and the interface documents needed by the people reviewing your site. Record which drawings are for review and which are agreed for the order.
Does a certificate cover my court?
Check the document’s issuer, named model, components, and scope. Ask the supplier to explain how those details relate to the proposed system and let the responsible project reviewers assess the requirements that apply.
Is installation included?
Read the offer’s written scope. Ask what guidance or site services the Padbol court manufacturer includes, which work remains with other parties, and who records the agreed checks.
What should my RFQ contain?
Include the location, intended use, quantity, model or options, measured site information available to you, desired delivery point, and requested services. Ask for exclusions and unresolved inputs to be stated clearly.
Use the same questions with every Padbol court manufacturer and keep the answers with the order review. To discuss a PEDI proposal, share your site details, requested model, and the work you want included. Send your RFQ to PEDI.